The Truck Committee of the Tallman Fire Department spent 2 days visiting the Seagrave Factory in Clintonville, Wisconsin to perform a final inspection of its new 2000 GPM Pumper, which will be designated 20-Tanker.

During the visit, every specification was reviewed for accuracy, every function and feature was tested, the truck was pumped and road tested. Minor last-minute changes were made, and the truck will be in the NY area in about 2 weeks for final fitting, lettering, and getting ready for service.